The filming we did tonight was actually successful. Having created an important shot list by compiling the storyboard with the shots that didn't work in the first draft we realised what we needed to do. We had around 26 shots to re shoot in the evening so time was not to much of an issue. Effective preparation meant we had no issues during the process. Pre charging the battery the night before and having the drums at the location for the day enabled a swift transition from planning to filming.
One issue which arose was the charge of the battery. Despite beginning the evening with a full charge the concurrent use of both live view and being on for long times led to a depletion of battery. However we countered this problem by ensuring the camera was switched off whenever there was a pause in filming. Such as in between shots. By doing this we kept the camera going all night, allowing no problems to the filming schedule.
Overall, I feel this is the most successful nights filming we have completed.
No comments:
Post a Comment